TM 11-5841-283-12/NAVAIR 16-30APR39-1
4-7. TOOLS, TEST EQUIPMENT, AND MATERIALS REQUIRED FOR INITIAL INSTALLATION.
The tools, test equipment, and materials required for the initial installation of the radar
signal detecting set are shown in the Maintenance Allocation Chart listed in appendix B.
4-8. CABLE CONNECTIONS.
Cable connections between radar signal detecting set components are listed below. For a detailed
cable diagram, see figure FO-1 in the back of this manual.
CABLE FROM
CABLE TO
COMPONENT
PLUG
JACK
COMPONENT
PLUG
JACK
J1
3P1-1
Indicator (Unit 2)
J1
2P1-1
J1
3P1-2
J1
2P1-2
J1
3P1-3
2P1-3
J1
J1
3P1-4
J1
2P1-4
J1
3P1-5
J1
2P1-5
J1
3P1-7
Receiver (unit 4)
J5
4P5
J1
3P1-8
J3
4P3
J1
3P1-9
J4
4P4
3P1-12
J1
Control unit (unit 1)
J1
1P1-2
J1
3P1-13
J1
1P1-3
J1
3P1-14
J1
1P1-4
J1
3P1-15
J1
1P1-5
J1
3P1-17
Receiver (unit 5)
J5
5P5
J1
3P1-18
J3
5P3
J1
3P1-19
5P4
J4
--
--
J1
3P1-21,22
See Note
J2
3P2
Blade antenna
J1
10P1
(unit 10)
Indicator (unit 2)
J1
2P1-7
Control unit (unit 1)
1P1-7
J1
J1
2P1-8
1P1-8
J1
J1
2P1-9
1P1-9
J1
Control unit
J1
1P1-12,
See note
(unit 1)
13,14
See note
1P1-21,
22,23
Receiver (unit 4)
J1
4P1
6P1
J1
J2
4P2
Antenna (unit 9)
9P1
J1
Receiver (unit 5)
J1
5P1
J1
5P1
J2
5P2
8P1
J1
NOTE
Comparator and control unit aircraft connections are to be determined at initial
installation.
4-10