TM 11-6625-586-45
CHAPTER 4
GENERAL SUPPORT TESTING PROCEDURES
tings column; then perform each specific test
4-1. General
procedure and verify it against its performance
a. Testing procedure are prepared for use by
standard.
Electronics Field Maintenance Shops and Service
Organizations responsible for general support
42. Test Equipment Required
maintenance of repaired equipment. These proce-
All the test equipment required to perform the
dures set forth specific requirements that re-
testing procedures given in this section are listed
paired equipment must meet before it is returned
in the chart below, and are authorized under TA
to the using organization.
11-17 and TA 11-100(11-17).
b. Comply with the instructions preceding
Technical manual
Nomenclature
each chart before proceeding to the chart. Per-
TM 11-6625700-10
Electronic, Counter,
form each step in sequence. For each step, per-
Digital Readout AN/
form all the actions required in the Control set-
USM-207
4-1