Sections II-III
nance, alignment and overhaul operations on Signal
Generator SG-13/ARN are listed in table VI and
2-4. The special tools required to perform mainte-
1
2
capacitors.
3
4
5
6
7
8
SECTION III
PREPARATION FOR USE AND RESHIPMENT
3-1. PREPARATION FOR USE.
b. Place four Adapters UG-201/U and one Adapter
UG-29/U into the mailing bag and place the bag in
case 2.
3-2. Remove the crating from each case and examine
the equipment for damage that may have occurred
c . Close the cover of case 2 and lock the two
during shipment. Check the contents of each case
catches.
d. Coil the two 10-foot cables, place them on the
cover of case 1 and tighten the two straps.
3-3. PREPARATION FOR SHIPMENT OR
STORAGE.
e. Replace the remaining accessories on the cover
and check that they are properly mounted in their
3-4. Prepare the equipment
for shipment or
storage
clamps. See figure 1-2 for the location of accessories
as follows:
on the cover.
a. Coil the two 25-foot and the two 50-foot cables
f. Replace the cover of case 1 and lock the two
and with the power adapter, place them in case 2.
catches.