TM 11-6625-3041-12/TO 33A1-8-908-1
PREPARATION FOR USE (cont)
2-3.
Remove front
cover.
Press in cap on
Ground
q
Connection
GND lug to expose
internal slot.
Place heavy gage
q
ground wire (not
supplied) in slot
and release pres-
sure on cap.
Connect other end
of wire to suit-
able ground. In
the shelter this
ground can be an
equipment rack.
Outside the shelter this ground can be the equipment under
test.